Part of the monster has started to be painted black. We are still waiting for the first corkscrew to be installed as well as the helix.Ĭhanges are being made to the station, scaffolding has been erected and the eyes have been removed from the monster. It now looks like the inversion is actually made up from three different track segments, where before it was constructed of two longer segments.Ī primer coat has now been applied to the lift hill in preparation for being painted black with the red veins. It has also been noted that the vertical loop has thicker spine sections to connect to the supports, this is assumed to be to made it stronger so it lasts longer. It appears to have slightly different profiling and appears to be more compact than before so you won't spend as much time on your back. You can get great views of this from the ground level and observation platform. UPDATE July 27 - In the latest construction update posted to YouTube by Theme Park Worldwide, we can see that the Zero-G roll has now been installed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |